12 bilder
Wohnung
·
Zur Miete
1.600 €
Perfect loft located in Weener with two patios
Ihlow, Aurich
· 97 m² · 2 Zimmer · Wohnung
Ihlow, Aurich · 97 m² · 2 Zimmer · Wohnung
Above you is only the wide sky of East Frisia, but from the east terrace you can look out over the tranquil Weener marina and the Ems dyke. The next luxury liner from the Meyer shipyard will pass right by your terrace. On the west terrace, above all the neighboring houses, you can enjoy the setting sun in the evening. Thanks to its location on a residential street with no through traffic, it is quiet at all times of the day. The penthouse, with its spacious floor plan and airy ceiling height, offers a touch of luxurious living combined with a practical room layout. The bathroom with underfloor heating, bathtub, and separate, spacious shower is laid with marble tiles and equipped with high-quality sanitary fixtures. The interior doors and designer light switches reflect the design vision that matches the property. Guests will find a separate guest WC. The fitted kitchen is fully and functionally equipped and has a bright design. A storage room next to the kitchen provides space for supp
Above you is only the wide sky of East Frisia, but from the east terrace you can look out over the tranquil Weener marina and the Ems dyke. The next luxury liner from the Meyer shipyard will pass right by your terrace. On the west terrace, above all the neighboring houses, you can enjoy the setting sun in the evening. Thanks to its location on a residential street with no through traffic, it is quiet at all times of the day. The penthouse, with its spacious floor plan and airy ceiling height, offers a touch of luxurious living combined with a practical room layout. The bathroom with underfloor heating, bathtub, and separate, spacious shower is laid with marble tiles and equipped with high-quality sanitary fixtures. The interior doors and designer light switches reflect the design vision that matches the property. Guests will find a separate guest WC. The fitted kitchen is fully and functionally equipped and has a bright design. A storage room next to the kitchen provides space for supp
1.600 €