12 bilder
Haus
·
Zur Miete
2.910 €
Modern and sunny dream house 180m2 with large garden, balcony, terrace and parking spaces in Marwitz / Velten
Groß-Ziethen, Kremmen
· 180 m² · 4 Zimmer · Haus
· Büroraum
Groß-Ziethen, Kremmen · 180 m² · 4 Zimmer · Haus · Büroraum
We are renting out our two-story, cozy and very well-kept house in Oberkrämer (Marwitz/Velten) - in a green location; available from September 1st, 2024. The modern house with 5.5 rooms offers plenty of space on a total of 180m2. The house was built in 2010 on a plot of approx. 900m2 and is in perfect condition. The ground floor has a bedroom, a bathroom with shower/bathtub, a large living room and an open kitchen. The upper floor has a bedroom, a bathroom with shower, a small office, a music room in the attic and a large living room (bedroom) with an open kitchen. On the ground floor and on the upper floor, large windows let in a lot of sunlight. From the living room on the upper floor you can enjoy a generous view of the greenery. Children can also feel at home here, because the large garden (180m2) with a slide and trampoline invites you to play. Location: The property is located in Marwitz/Velten - Oberkrämer. Bus lines 651, 811 and 824 run nearby. There are supermarkets and a rest
We are renting out our two-story, cozy and very well-kept house in Oberkrämer (Marwitz/Velten) - in a green location; available from September 1st, 2024. The modern house with 5.5 rooms offers plenty of space on a total of 180m2. The house was built in 2010 on a plot of approx. 900m2 and is in perfect condition. The ground floor has a bedroom, a bathroom with shower/bathtub, a large living room and an open kitchen. The upper floor has a bedroom, a bathroom with shower, a small office, a music room in the attic and a large living room (bedroom) with an open kitchen. On the ground floor and on the upper floor, large windows let in a lot of sunlight. From the living room on the upper floor you can enjoy a generous view of the greenery. Children can also feel at home here, because the large garden (180m2) with a slide and trampoline invites you to play. Location: The property is located in Marwitz/Velten - Oberkrämer. Bus lines 651, 811 and 824 run nearby. There are supermarkets and a rest
2.910 €